{"id":66718,"date":"2024-02-12T18:55:59","date_gmt":"2024-02-12T18:55:59","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/?p=66718"},"modified":"2024-02-12T17:03:53","modified_gmt":"2024-02-12T17:03:53","slug":"uganda-switches-on-last-unit-of-karuma-dam","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam","title":{"rendered":"Uganda switches on last unit of Karuma Dam"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Uganda. <\/strong><\/span><b>Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Electricity Generation Company Limited (UEGCL).<\/b><\/p>\n<p>The 600MW dam is located on the Nile River in Kiryandongo district 270km north of Kampala. The first unit of the power plant completed its trial run and grid connection tests on March 21, 2023.<\/p>\n<p>Financed by the Export-Import Bank of China, the dam is critical in meeting the region\u2019s increasing electricity demand in efforts to accelerate industrialisation.<\/p>\n<p>It has been touted as the project that will reverse the high cost of power that is impacting the government\u2019s industrialisation drive as well as increase the country\u2019s capacity to export power, even though it comes with more debt repayment pressure, energy economists say.<\/p>\n<p>The dam is poised to generate power for export to South Sudan, about 180km away, and the Democratic Republic of Congo, about 200km away.<\/p>\n<p>Last year, Uganda and South Sudan signed a Power Sales Agreement for trade in electricity between the two countries. The deal was signed in the South Sudanese capital Juba. The power will be supplied mainly to the towns of Oraba, Elegu, Kaya, and Nimule in South Sudan before extending it to Juba.<\/p>\n<p>\u201cKaruma is going to produce more electricity than we can consume. To get full benefit on the purpose of our borrowing, this power must be exported,\u201d Mr Stephen Mukitale-an energy economist says.<\/p>\n<p>Uganda borrowed 85 percent ($1.44 billion) of the $1.7 billion project cost from China\u2019s Eximbank for the construction of the dam.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Electricity Generation Company Limited (UEGCL). The 600MW dam is located on the Nile River in Kiryandongo district 270km north of Kampala. The first unit of the power plant completed its trial run and [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":66717,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,7,258],"tags":[233,240,234],"class_list":["post-66718","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-head-lines","category-to-homepage","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Uganda switches on last unit of Karuma Dam - Uganda<\/title>\n<meta name=\"description\" content=\"Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Ele ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Uganda switches on last unit of Karuma Dam\" \/>\n<meta property=\"og:description\" content=\"Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Ele ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-12T18:55:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"675\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Uganda switches on last unit of Karuma Dam\",\"datePublished\":\"2024-02-12T18:55:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam\"},\"wordCount\":274,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"economy\",\"head lines\",\"to-homepage\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam\",\"name\":\"Uganda switches on last unit of Karuma Dam - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg\",\"datePublished\":\"2024-02-12T18:55:59+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Ele ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg\",\"width\":1200,\"height\":675,\"caption\":\"Uganda switches on last unit of Karuma Dam\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Uganda switches on last unit of Karuma Dam\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Uganda switches on last unit of Karuma Dam - Uganda","description":"Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Ele ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam","og_locale":"en_US","og_type":"article","og_title":"Uganda switches on last unit of Karuma Dam","og_description":"Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Ele ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2024-02-12T18:55:59+00:00","og_image":[{"width":1200,"height":675,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Uganda switches on last unit of Karuma Dam","datePublished":"2024-02-12T18:55:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam"},"wordCount":274,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","economy","head lines","to-homepage"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam","name":"Uganda switches on last unit of Karuma Dam - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg","datePublished":"2024-02-12T18:55:59+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Uganda on Tuesday launched the last unit of the six turbines at the Karuma hydro-power plant, according to Uganda Ele ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2024\/02\/sm_1707744332.049295.jpg","width":1200,"height":675,"caption":"Uganda switches on last unit of Karuma Dam"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/uganda-switches-on-last-unit-of-karuma-dam#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"Uganda switches on last unit of Karuma Dam"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/66718","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=66718"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/66718\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/66717"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=66718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=66718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=66718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}