{"id":9268,"date":"2021-04-28T17:14:35","date_gmt":"2021-04-28T17:14:35","guid":{"rendered":"https:\/\/www.africa-press.net\/uganda\/?p=9268"},"modified":"2021-04-28T16:15:47","modified_gmt":"2021-04-28T16:15:47","slug":"eskom-invests-in-kiira-dam-water-controllers","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers","title":{"rendered":"Eskom invests in Kiira dam water controllers"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.net\/uganda\">Uganda<\/a>. <\/strong><\/span>Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment.<\/p>\n<p>The system, which is also known as the electronic governor upgrade, controls the flow of water through the hydraulic turbines that vary flow, speed and power output.<\/p>\n<p>The system had last been replaced in 2007 and had reached their end of operational life.<\/p>\n<p>Ms Thozama Gangi, the Eskom Uganda managing director, while speaking at the project handover said the old governors had been replaced with digital governors to improve unit efficiency and reliability. Uganda had been experiencing persistent power outages with some of the causes pointing to old age of both machinery and equipment.<\/p>\n<p>The new governors will have a lifecycle of 15 years with guaranteed technical, engineering and spares support.Mr Andreas P\u00fchringer, the project design engineer from Andrtiz Hydro GmbH, said he had been part of the team that had installed the first governors Nalubaale in 2007, noting they had installed two more controllers that will help to serve the increasing electricity demands as well as improving reliability of electricity supply.<\/p>\n<p>The construction of Kiira Power Station began in 1993 and was completed in 2003. The plant has an installed capacity of 200 megawatts with five units, each producing 40MW. Eskom has been maintaining and operating the plant since 2003 in a 20-year concession.<\/p>\n<p><b>About kiira<\/b><\/p>\n<p>Kiira Power Station has an installed capacity of 200MW with five units, each producing 40MW. The dam is run by Eskom.<\/p>\n<p><b>editorial@ug.nationmedia.com<\/b><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Uganda. Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment. The system, which is also known as the electronic governor upgrade, controls the flow of water through the hydraulic turbines that vary flow, speed and power output. The system had last been replaced in 2007 and had [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":9267,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5,8],"tags":[233,240,234],"class_list":["post-9268","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","category-homepage-english","tag-africa-press","tag-africa-press-uganda","tag-uganda"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Eskom invests in Kiira dam water controllers - Uganda<\/title>\n<meta name=\"description\" content=\"Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment. The system, which is also kn ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eskom invests in Kiira dam water controllers\" \/>\n<meta property=\"og:description\" content=\"Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment. The system, which is also kn ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers\" \/>\n<meta property=\"og:site_name\" content=\"Uganda\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-28T17:14:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Eskom invests in Kiira dam water controllers\",\"datePublished\":\"2021-04-28T17:14:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers\"},\"wordCount\":253,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Uganda\",\"uganda\"],\"articleSection\":[\"all news\",\"economy\",\"homepage-english\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers\",\"name\":\"Eskom invests in Kiira dam water controllers - Uganda\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg\",\"datePublished\":\"2021-04-28T17:14:35+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment. The system, which is also kn ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg\",\"width\":720,\"height\":480,\"caption\":\"Eskom invests in Kiira dam water controllers\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/uganda\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eskom invests in Kiira dam water controllers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#website\",\"url\":\"https:\/\/www.africa-press.net\/uganda\/\",\"name\":\"Uganda\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Eskom invests in Kiira dam water controllers - Uganda","description":"Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment. The system, which is also kn ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers","og_locale":"en_US","og_type":"article","og_title":"Eskom invests in Kiira dam water controllers","og_description":"Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment. The system, which is also kn ...","og_url":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers","og_site_name":"Uganda","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2021-04-28T17:14:35+00:00","og_image":[{"width":720,"height":480,"url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Eskom invests in Kiira dam water controllers","datePublished":"2021-04-28T17:14:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers"},"wordCount":253,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg","keywords":["Africa Press","Africa Press-Uganda","uganda"],"articleSection":["all news","economy","homepage-english"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers","url":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers","name":"Eskom invests in Kiira dam water controllers - Uganda","isPartOf":{"@id":"https:\/\/www.africa-press.net\/uganda\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg","datePublished":"2021-04-28T17:14:35+00:00","author":{"@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Eskom has replaced the water flow controller at Kiira Power Station in a Shs5b investment. The system, which is also kn ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#primaryimage","url":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg","contentUrl":"https:\/\/static.africa-press.net\/uganda\/sites\/34\/2021\/04\/img-60898a19bf6d7.jpg","width":720,"height":480,"caption":"Eskom invests in Kiira dam water controllers"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/uganda\/all-news\/eskom-invests-in-kiira-dam-water-controllers#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/uganda\/"},{"@type":"ListItem","position":2,"name":"Eskom invests in Kiira dam water controllers"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/uganda\/#website","url":"https:\/\/www.africa-press.net\/uganda\/","name":"Uganda","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/uganda\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/uganda\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/9268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/comments?post=9268"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/posts\/9268\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media\/9267"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/media?parent=9268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/categories?post=9268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/uganda\/wp-json\/wp\/v2\/tags?post=9268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}