{"id":35793,"date":"2022-12-03T12:19:46","date_gmt":"2022-12-03T12:19:46","guid":{"rendered":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala"},"modified":"2022-12-03T12:19:46","modified_gmt":"2022-12-03T12:19:46","slug":"load-shedding-to-last-up-to-four-months-at-the-most-says-kapala","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala","title":{"rendered":"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zambia. <\/strong><\/span>Energy minister Peter Kapala says the load management of ZESCO power that will kick in on December 15 as a result of reduced water levels in the shared Lake Kariba is estimated to only last four months.<\/p>\n<p>Delivering a ministerial statement on the reduced water levels at Lake Kariba in Parliament on Friday, Kapala said the government is nonetheless instituting measures to reduce the impact from the forthcoming six-hour load-shedding of ZESCO power necessitated by reduced water levels in the Kariba Dam, and as directed by the Zambezi River Authority (ZRA).<\/p>\n<p>\u201cI wish to thank you for this opportunity to give a<\/p>\n<p>Ministerial Statement on the hydrology situation at the Kariba Dam, and more importantly, the measures we are undertaking to mitigate the impact on low power<\/p>\n<p>generation threat,\u201d Kapala said. \u201cDuring the year 2022, the Lake\u2019s water level has been decreasing steadily on account of low inflows from the mainstream Zambezi River and its tributaries.\u201d<\/p>\n<p>Furthermore, Kapala said the situation has been worsened due to the overutilization of water for sustained power generation which has resulted in low water levels at Lake Kariba.<\/p>\n<p>\u201cAs of 28th November 2022, the Kariba lake water levels stood at 476.09m above sea level, representing only 4.12%of usable water storage for power generation.The low water level situation in the Lake Kariba<\/p>\n<p>threatens the power generation for both the Kariba North Bank Hydropower station (Zambian side) and Kariba South Bank Hydropower station (Zimbabwean side),\u201d he announced. \u201cIt is projected that if the current power generation and<\/p>\n<p>subsequent water utilization continues, the remaining water for power generation at the Kariba complex, also referred to as live storage,will not be sufficient for power generation beyond mid-December 2022.\u201d Therefore, Kapala said, the government will take measures to address the situation.<\/p>\n<p>\u201cWe anticipate that based on the water levels, this will translate into a load management regime starting on 15th December 2022 of up to a maximum of six (6) hours daily until the water levels improve,\u201d said Kapala. \u201cAgainst this background, there is need to implement<\/p>\n<p>measures aimed at rationing the water in the lake in order to avoid a complete shutdown of electricity generation activities at the Kariba Complex.The proposed measures will be phased and revisited from time to time over the next four (4) months in order to ensure security of electricity supply and mitigate the impact on the economy.\u201d<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/zambia\">Zambia<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zambia. Energy minister Peter Kapala says the load management of ZESCO power that will kick in on December 15 as a result of reduced water levels in the shared Lake Kariba is estimated to only last four months. Delivering a ministerial statement on the reduced water levels at Lake Kariba in Parliament on [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":35792,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[234,235,233],"class_list":["post-35793","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-zambia","tag-zambia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA - Zambia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA\" \/>\n<meta property=\"og:description\" content=\"Africa-Press &#8211; Zambia. Energy minister Peter Kapala says the load management of ZESCO power that will kick in on December 15 as a result of reduced water levels in the shared Lake Kariba is estimated to only last four months. Delivering a ministerial statement on the reduced water levels at Lake Kariba in Parliament on [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala\" \/>\n<meta property=\"og:site_name\" content=\"Zambia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-03T12:19:46+00:00\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA\",\"datePublished\":\"2022-12-03T12:19:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala\"},\"wordCount\":415,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Zambia\",\"Zambia\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala\",\"url\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala\",\"name\":\"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA - Zambia\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg\",\"datePublished\":\"2022-12-03T12:19:46+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg\",\"width\":1080,\"height\":841,\"caption\":\"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/zambia\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zambia\/\",\"name\":\"Zambia\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zambia\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA - Zambia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala","og_locale":"en_US","og_type":"article","og_title":"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA","og_description":"Africa-Press &#8211; Zambia. Energy minister Peter Kapala says the load management of ZESCO power that will kick in on December 15 as a result of reduced water levels in the shared Lake Kariba is estimated to only last four months. Delivering a ministerial statement on the reduced water levels at Lake Kariba in Parliament on [&hellip;]","og_url":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala","og_site_name":"Zambia","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-12-03T12:19:46+00:00","author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA","datePublished":"2022-12-03T12:19:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala"},"wordCount":415,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg","keywords":["Africa Press","Africa Press-Zambia","Zambia"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala","url":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala","name":"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA - Zambia","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zambia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg","datePublished":"2022-12-03T12:19:46+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#primaryimage","url":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg","contentUrl":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670057404.58.jpg","width":1080,"height":841,"caption":"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/load-shedding-to-last-up-to-four-months-at-the-most-says-kapala#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/zambia\/"},{"@type":"ListItem","position":2,"name":"LOAD-SHEDDING TO LAST UP TO FOUR MONTHS AT THE MOST, SAYS KAPALA"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zambia\/#website","url":"https:\/\/www.africa-press.net\/zambia\/","name":"Zambia","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zambia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/posts\/35793","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/comments?post=35793"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/posts\/35793\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/media\/35792"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/media?parent=35793"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/categories?post=35793"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/tags?post=35793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}