{"id":35937,"date":"2022-12-06T18:59:55","date_gmt":"2022-12-06T18:59:55","guid":{"rendered":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown"},"modified":"2022-12-06T18:59:55","modified_gmt":"2022-12-06T18:59:55","slug":"zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown","title":{"rendered":"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zambia. <\/strong><\/span>THE Zambezi River Authority has firmly guided that the Zimbabwe Power Company (ZPC) and Kariba Hydro Power Company Limited (KHPC) immediately ensure that generation activities at the South Bank Power Station are wholly suspended henceforth, until January 2023.<\/p>\n<p>Authority chief executive engineer Munyaradzi Munodawafa said the suspension will be in place untill a further review of the substantive hydrological outlook at Kariba is undertaken which will include consideration of the total reservoir live storage build-up which would have resulted from a shutdown of the Kariba South Bank Power Station power generation operations.<\/p>\n<p>In a letter addressed to Zimbabwe Power Company managing director and copied to Zesco managing director , engineer Munodawafa said there is highly unlikely that there will be any reasonable inflow augmentation in the remaining period of the year 2022, giving little or no chance of improvement in the reservoir storage levels during the remaining period of the year 2022 and going into the first quarter of the year 2023.<\/p>\n<p>\u201cPlease be advised that as of 25th November 2022, Kariba South Bank Power Station had utilised 23.89 Billion Cubic Meters (BCM) of water, accounting for 1.39 BCM (or 6.16%) above the 2022 water allocation of 22.50 BCM.<\/p>\n<p>Given that the Kariba Reservoir usable storage currently stands at a paltry 2.98 BCM or 4.60% full, and that ZESCO Limited still has a positive balance of 2.44BCM (10.82%) as of 25th November 2022, ZPC\/KHPC no longer has any usable water to continue undertaking power generation operations at Kariba South Bank Power Station.With the current performance of the 2022\/2023 rainfall season in the Kariba Lower Catchment where the river flows are yet to improve and the associated inflows from the Upper Kariba Catchment which will only influence any potential increase in the Lake Level at Kariba during the later part of the first quarter of 2023,\u201d he said.<\/p>\n<p>Engineer Munodawafa said if the current water utilisation above allocation at Kariba South Bank Power Station continues, the remaining water for power generation at Kariba (will run out by mid-December 2022 or much earlier.<\/p>\n<p>\u201cGuided by the Water Purchase Agreement and the provisions of the ZRA Acts, as well as the agreed Reservoir Operational Framework under the Joint Technical Committee (JTC), where the Authority and the two Kariba Power Generation Utilities are obligated and have agreed to sustainably operate the reservoir, the Zambezi River Authority is left with no choice but to firmly guide that ZPC\/KHPC immediately ensures that generation activities at the South Bank Power Station are wholly suspended henceforth, until January 2023 when a further review of the substantive Hydrological Outlook at Kariba will be undertaken which will include consideration of the total reservoir live storage build-up which would have resulted from a shutdown of the Kariba South Bank Power Station power generation operations,\u201d he said.<\/p>\n<p><strong>For More News And Analysis About <a href=\"https:\/\/www.africa-press.net\/zambia\">Zambia<\/a> Follow <a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zambia. THE Zambezi River Authority has firmly guided that the Zimbabwe Power Company (ZPC) and Kariba Hydro Power Company Limited (KHPC) immediately ensure that generation activities at the South Bank Power Station are wholly suspended henceforth, until January 2023. Authority chief executive engineer Munyaradzi Munodawafa said the suspension will be in place untill [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":35936,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,5],"tags":[234,235,233],"class_list":["post-35937","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-africa-press","tag-africa-press-zambia","tag-zambia"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown - Zambia<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown\" \/>\n<meta property=\"og:description\" content=\"Africa-Press &#8211; Zambia. THE Zambezi River Authority has firmly guided that the Zimbabwe Power Company (ZPC) and Kariba Hydro Power Company Limited (KHPC) immediately ensure that generation activities at the South Bank Power Station are wholly suspended henceforth, until January 2023. Authority chief executive engineer Munyaradzi Munodawafa said the suspension will be in place untill [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown\" \/>\n<meta property=\"og:site_name\" content=\"Zambia\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/AfricaPressTunisiaa\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-06T18:59:55+00:00\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown\",\"datePublished\":\"2022-12-06T18:59:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown\"},\"wordCount\":481,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Zambia\",\"Zambia\"],\"articleSection\":[\"all news\",\"economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown\",\"url\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown\",\"name\":\"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown - Zambia\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg\",\"datePublished\":\"2022-12-06T18:59:55+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg\",\"width\":720,\"height\":478,\"caption\":\"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/zambia\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zambia\/\",\"name\":\"Zambia\",\"description\":\"Just another Africa News Agency Sites site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zambia\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g\",\"caption\":\"cfeditoren\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown - Zambia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown","og_locale":"en_US","og_type":"article","og_title":"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown","og_description":"Africa-Press &#8211; Zambia. THE Zambezi River Authority has firmly guided that the Zimbabwe Power Company (ZPC) and Kariba Hydro Power Company Limited (KHPC) immediately ensure that generation activities at the South Bank Power Station are wholly suspended henceforth, until January 2023. Authority chief executive engineer Munyaradzi Munodawafa said the suspension will be in place untill [&hellip;]","og_url":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown","og_site_name":"Zambia","article_publisher":"https:\/\/www.facebook.com\/AfricaPressTunisiaa","article_published_time":"2022-12-06T18:59:55+00:00","author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown","datePublished":"2022-12-06T18:59:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown"},"wordCount":481,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg","keywords":["Africa Press","Africa Press-Zambia","Zambia"],"articleSection":["all news","economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown","url":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown","name":"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown - Zambia","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zambia\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg","datePublished":"2022-12-06T18:59:55+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#primaryimage","url":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg","contentUrl":"https:\/\/static.africa-press.net\/zambia\/sites\/35\/2022\/12\/postQueueImg_1670340616.88.jpg","width":720,"height":478,"caption":"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zambia\/all-news\/zambezi-river-authority-orders-the-shut-down-of-kariba-south-bank-power-station-to-avert-the-risk-of-total-shutdown#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/zambia\/"},{"@type":"ListItem","position":2,"name":"Zambezi River Authority orders the shut down of Kariba South Bank power station to avert the risk of total shutdown"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zambia\/#website","url":"https:\/\/www.africa-press.net\/zambia\/","name":"Zambia","description":"Just another Africa News Agency Sites site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zambia\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zambia\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7417380fa9e23b5c57fdbfdaf3fdf92ee478f759a084addda5faa3732853e74a?s=96&d=mm&r=g","caption":"cfeditoren"}}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/posts\/35937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/comments?post=35937"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/posts\/35937\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/media\/35936"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/media?parent=35937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/categories?post=35937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/zambia\/wp-json\/wp\/v2\/tags?post=35937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}