{"id":106096,"date":"2025-03-18T22:52:50","date_gmt":"2025-03-18T20:52:50","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister"},"modified":"2025-04-03T18:45:31","modified_gmt":"2025-04-03T16:45:31","slug":"beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister","title":{"rendered":"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years &#8211; Transport Minister"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zimbabwe. <\/strong><\/span>Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being structured to address the rehabilitation of the Beitbridge-Bulawayo-Victoria Falls Road, which is currently in poor condition.<\/p>\n<p>Speaking at a media briefing in Harare on Monday, 17 March, Mhona said the PPP arrangement is undergoing due process, including a feasibility study and other preliminary assessments.<\/p>\n<p>He urged the public to be patient, saying the estimated timeline for completing the rehabilitation of this vital stretch of road is 36 months.<\/p>\n<p>Mhona also emphasized the capital-intensive nature of such infrastructure projects, revealing that the global average cost for road reconstruction is approximately US$1 million per kilometre. He said:<\/p>\n<p>Zimbabwe\u2019s entire road network spans close to 90 000 kilometres, including gravel roads in rural areas. Under normal circumstances, we would appeal to financiers for concessionary facilities with flexible grace periods to fund such projects. However, the illegal sanctions imposed on Zimbabwe have significantly impacted our ability to secure funding for infrastructure development.<\/p>\n<p>The Minister said the Zimbabwe National Road Administration (ZINARA) has played a crucial role in collecting funds to ensure the maintenance of the country\u2019s roads.<\/p>\n<p>The Ministry of Transport recently announced that sections of the Bulawayo-Victoria Falls Highway, in urgent need of repair, are being addressed through a collaborative effort between the Department of Roads and Bitumen World. It added that work is already underway, with teams stationed in Hwange, Halfway, and Insuza.<\/p>\n<p><strong>For More News And Analysis About <span style=\"color: #ff6600\">Zimbabwe<\/span> Follow <span style=\"color: #ff6600\">Africa-Press<\/span><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being structured to address the rehabilitation of the Beitbridge-Bulawayo-Victoria Falls Road, which is currently in poor condition. Speaking at a media briefing in Harare on Monday, 17 March, Mhona said the PPP arrangement is undergoing due process, including [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":106095,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,4],"tags":[18193,12738,14912,9397,19],"class_list":["post-106096","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","tag-beitbridge-bulawayo-victoria-falls-road","tag-bulawayo-victoria-falls-road","tag-bulawayo-victoria-falls-highway","tag-road-rehabilitation","tag-zimbabwe"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister - zimbabwe<\/title>\n<meta name=\"description\" content=\"Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being s ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister\" \/>\n<meta property=\"og:description\" content=\"Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being s ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-18T20:52:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-03T16:45:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1556\" \/>\n\t<meta property=\"og:image:height\" content=\"1167\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years &#8211; Transport Minister\",\"datePublished\":\"2025-03-18T20:52:50+00:00\",\"dateModified\":\"2025-04-03T16:45:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister\"},\"wordCount\":259,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg\",\"keywords\":[\"Beitbridge-Bulawayo-Victoria Falls Road\",\"Bulawayo - Victoria Falls Road\",\"Bulawayo-Victoria Falls Highway\",\"Road Rehabilitation\",\"Zimbabwe\"],\"articleSection\":[\"all news\",\"community\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister\",\"name\":\"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg\",\"datePublished\":\"2025-03-18T20:52:50+00:00\",\"dateModified\":\"2025-04-03T16:45:31+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being s ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg\",\"width\":1556,\"height\":1167,\"caption\":\"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years &#8211; Transport Minister\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister - zimbabwe","description":"Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being s ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister","og_locale":"en_US","og_type":"article","og_title":"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister","og_description":"Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being s ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister","og_site_name":"zimbabwe","article_published_time":"2025-03-18T20:52:50+00:00","article_modified_time":"2025-04-03T16:45:31+00:00","og_image":[{"width":1556,"height":1167,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years &#8211; Transport Minister","datePublished":"2025-03-18T20:52:50+00:00","dateModified":"2025-04-03T16:45:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister"},"wordCount":259,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg","keywords":["Beitbridge-Bulawayo-Victoria Falls Road","Bulawayo - Victoria Falls Road","Bulawayo-Victoria Falls Highway","Road Rehabilitation","Zimbabwe"],"articleSection":["all news","community"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister","name":"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg","datePublished":"2025-03-18T20:52:50+00:00","dateModified":"2025-04-03T16:45:31+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"Transport and Infrastructural Development Minister, Felix Mhona, said that a Public-Private Partnership (PPP) is being s ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2025\/03\/sm_1742326234.826944.jpg","width":1556,"height":1167,"caption":"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years - Transport Minister"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/beitbridge-bulawayo-victoria-falls-road-rehab-to-be-completed-in-three-years-transport-minister#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"Beitbridge-Bulawayo-Victoria Falls Road Rehab To Be Completed In Three Years &#8211; Transport Minister"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts\/106096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/comments?post=106096"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts\/106096\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/media\/106095"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/media?parent=106096"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/categories?post=106096"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/tags?post=106096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}