{"id":40984,"date":"2021-05-26T17:27:17","date_gmt":"2021-05-26T15:27:17","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/?p=40984"},"modified":"2021-05-26T15:12:37","modified_gmt":"2021-05-26T13:12:37","slug":"zinara-says-impressed-with-road-upgrades-under-hwange-board","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board","title":{"rendered":"ZINARA Says Impressed With Road Upgrades Under Hwange Board"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong><a href=\"https:\/\/www.africa-press.net\/\">Africa-Press<\/a> &#8211; <a href=\"https:\/\/www.africa-press.net\/zimbabwe\">Zimbabwe<\/a>. <\/strong><\/span><b>By Mbekezeli Ncube<\/b> &#8211; THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial work being carried out by the Hwange Local Board (HLB) under the Emergency Road Rehabilitation Programme (ERRP).<\/p>\n<p>Speaking during a tour of a site where roadworks are being undertaken by HLB through utilisation of ERRP funds, ZINARA Matabeleland North provincial technician Engineer Enock Masocha said he was impressed by the workmanship exhibited by the local authority at the preliminary stage of the road rehabilitation programme.<\/p>\n<p>Masocha constituted a high-powered provincial delegation led by Matabeleland Provincial Development Coordinator Sithandiwe Ncube to monitor and assess ERRP progress in the province.<\/p>\n<p>\u201cI\u2019m quite impressed by the work, which is currently undertaken by council under their scope of works, which is vegetation and drainage clearance, but I think the depth of the drains should be attended to,\u201d he said.<\/p>\n<p>HLB was allocated ZWL158 million under ERRP which would be carried out in phases.<\/p>\n<p>The local authority was allocated ZWL11 million for Phase One but has since received ZWL2,2 million.<\/p>\n<p>Phase One entails vegetation and drainage clearance as well as pothole patching.<\/p>\n<p>\u201cI\u2019m also glad that they are employing locals.<\/p>\n<p>\u201cHowever, we don\u2019t want a situation whereby people are not paid because it tarnishes the image of the entire programme.<\/p>\n<p>\u201cThey (council) should make sure they apply for disbursement on time, but otherwise I\u2019m impressed by the standard of the work so far,\u201d said Masocha.<\/p>\n<p>He also expressed satisfaction at the road rehabilitation work being carried out by Enfund Construction, a contractor engaged by the local authority.<\/p>\n<p>Ncube called on the council to expedite the road rehabilitation exercise so that the roads could be trafficable.<\/p>\n<p>\u201cThe funding is there but I\u2019m a bit worried about the pace in implementing the project by local authorities. I am, however, glad that we have picked up the tempo and we are now on track and moving with speed. I\u2019m saying let\u2019s utilise the money before it depreciates in value,\u201d she said.<\/p>\n<p>Ncube further said the local authority should prioritise rehabilitation of roads based on their importance to the general populace in a given area and economic impact.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. By Mbekezeli Ncube &#8211; THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial work being carried out by the Hwange Local Board (HLB) under the Emergency Road Rehabilitation Programme (ERRP). Speaking during a tour of a site where roadworks are being undertaken by HLB through utilisation of ERRP funds, [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":40983,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,4,35,15],"tags":[1493,2189,19],"class_list":["post-40984","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-community","category-homepage-english","category-twitter","tag-africa-press","tag-africa-press-zimbabwe-2","tag-zimbabwe"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ZINARA Says Impressed With Road Upgrades Under Hwange Board - zimbabwe<\/title>\n<meta name=\"description\" content=\"By Mbekezeli Ncube - THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ZINARA Says Impressed With Road Upgrades Under Hwange Board\" \/>\n<meta property=\"og:description\" content=\"By Mbekezeli Ncube - THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-26T15:27:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"816\" \/>\n\t<meta property=\"og:image:height\" content=\"612\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"ZINARA Says Impressed With Road Upgrades Under Hwange Board\",\"datePublished\":\"2021-05-26T15:27:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board\"},\"wordCount\":374,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg\",\"keywords\":[\"Africa Press\",\"Africa Press-Zimbabwe\",\"Zimbabwe\"],\"articleSection\":[\"all news\",\"community\",\"homepage-english\",\"twitter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board\",\"name\":\"ZINARA Says Impressed With Road Upgrades Under Hwange Board - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg\",\"datePublished\":\"2021-05-26T15:27:17+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"By Mbekezeli Ncube - THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg\",\"width\":816,\"height\":612,\"caption\":\"ZINARA Says Impressed With Road Upgrades Under Hwange Board\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ZINARA Says Impressed With Road Upgrades Under Hwange Board\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ZINARA Says Impressed With Road Upgrades Under Hwange Board - zimbabwe","description":"By Mbekezeli Ncube - THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board","og_locale":"en_US","og_type":"article","og_title":"ZINARA Says Impressed With Road Upgrades Under Hwange Board","og_description":"By Mbekezeli Ncube - THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board","og_site_name":"zimbabwe","article_published_time":"2021-05-26T15:27:17+00:00","og_image":[{"width":816,"height":612,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"ZINARA Says Impressed With Road Upgrades Under Hwange Board","datePublished":"2021-05-26T15:27:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board"},"wordCount":374,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg","keywords":["Africa Press","Africa Press-Zimbabwe","Zimbabwe"],"articleSection":["all news","community","homepage-english","twitter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board","name":"ZINARA Says Impressed With Road Upgrades Under Hwange Board - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg","datePublished":"2021-05-26T15:27:17+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"By Mbekezeli Ncube - THE Zimbabwe National Road Administration (ZINARA) has expressed satisfaction on the initial ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2021\/05\/img-60ae49203f7d1.jpg","width":816,"height":612,"caption":"ZINARA Says Impressed With Road Upgrades Under Hwange Board"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/zinara-says-impressed-with-road-upgrades-under-hwange-board#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"ZINARA Says Impressed With Road Upgrades Under Hwange Board"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts\/40984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/comments?post=40984"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts\/40984\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/media\/40983"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/media?parent=40984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/categories?post=40984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/tags?post=40984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}