{"id":97438,"date":"2024-08-09T23:14:06","date_gmt":"2024-08-09T21:14:06","guid":{"rendered":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan"},"modified":"2024-08-10T01:16:42","modified_gmt":"2024-08-09T23:16:42","slug":"kariba-dam-project-adds-60-years-to-lifespan","status":"publish","type":"post","link":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan","title":{"rendered":"Kariba Dam project adds 60 years to lifespan"},"content":{"rendered":"<p><span style=\"color: #ff6600\"><strong>Africa-Press &#8211; Zimbabwe. <\/strong><\/span>THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to completion.<\/p>\n<p>With the plunge pool new shape in place, the finalisation of demobilisation work will mark the completion of the project.<\/p>\n<p>It also marked the end of seven years of collaboration and commitment among Zimbabwe and Zambia, financiers, KDRP, supervising team and the contractor.<\/p>\n<p>It is anticipated that the rehabilitation efforts, which involved the excavation of roughly 750 000 tonnes of rock, will add 60 years to the bridge\u2019s lifespan.<\/p>\n<p>Aside from improving safety and increasing the dam\u2019s lifespan, the project has seen the reshaping of the plunge pool, which has increased its size, reducing the pressure the water spilling into the plunge pool exerts on the base of the pool while slowing the erosion of the natural rock floor.<\/p>\n<p>The rehabilitation project was awarded to French contractor Razel-Bec, under the supervision of Zambezi River Authority (ZRA) with technical assistance from Swiss company, Gruner Stucky.<\/p>\n<p>The project, estimated to cost US$294 million, is being funded by a combination of funds generated internally by ZRA, which is jointly owned by governments of Zimbabwe and Zambia.<\/p>\n<p>The project has amortised loans and grants from co-operating partners like the World Bank, African Development Bank, European Union and Swedish International Development Agency.<\/p>\n<p>Addressing delegates during the celebrations for the successful completion of the plunge pool reshaping in Kariba on Wednesday this week, Energy and Power Development minister Edgar Moyo said following the impoundment of the dam, which began in 1958, the natural riverbed downstream of the dam gradually eroded over several years to form an 81-metre plunge pool.<\/p>\n<p>\u201cThis naturally occurring development was not of concern to the Zambezi River Authority since the continued deepening of the plunge pool was anticipated as a feature for dissipating the erosive energy of the spilling water,\u201d he said.<\/p>\n<p>\u201cConcern subsequently arose from uncontrolled erosion along a zone of weaker rock which, if left unattended, would become a threat to the dam\u2019s foundation and the safety of the dam.<\/p>\n<p>\u201cThere was, therefore, need to reshape the plunge pool to create a new stepped profile aimed at decreasing the amount of swirling, improving energy dissipation and guiding the spilling water away from the dam foundation.\u201d<\/p>\n<p>Moyo said the weak rock in the fault zone was reinforced to prevent further scouring of the bedrock in the direction of the dam\u2019s foundation.<\/p>\n<p>\u201cContinued engagement with other dam safety experts confirmed that the dam\u2019s structural integrity was at stake.<\/p>\n<p>\u201cWe were faced with an imminent risk of losing over 500 000 lives if the Kariba Dam wall collapsed, with devastating impacts on over three million people downstream.<\/p>\n<p>\u201cThe multiplier effect of this catastrophe would result in the loss of key infrastructure, as well as the agriculture and tourism sectors in Zambia, Zimbabwe and Mozambique.\u201d<\/p>\n<p>He said losing the Kariba Dam wall would be a threat to regional energy security given the central nature of the lake and its role in regional integration.<\/p>\n<p>ZRA acting chief executive Sithembinkosi Mhlanga applauded the work done at the plunge pool saying it was a great milestone for both Zimbabwe and Zambia.<\/p>\n<p>\u201cThe completion of the plunge pool reshaping and commencement of refilling of the plunge pool are a great achievement in the history of the construction of the dam wall,\u201d he said.<\/p>\n<p>\u201cAs we complete the reshaping of the pool and plunge pool refilling, we also celebrate as no life was lost. This is a great testimony of how we value safety, health and environmental issues.\u201d<\/p>\n<p><strong>For More News And Analysis About Zimbabwe Follow Africa-Press<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Africa-Press &#8211; Zimbabwe. THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to completion. With the plunge pool new shape in place, the finalisation of demobilisation work will mark the completion of the project. It also marked the end of seven years of collaboration and [&hellip;]<\/p>\n","protected":false},"author":84,"featured_media":97437,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,6],"tags":[19],"class_list":["post-97438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-economy","tag-zimbabwe"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kariba Dam project adds 60 years to lifespan - zimbabwe<\/title>\n<meta name=\"description\" content=\"THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to ...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kariba Dam project adds 60 years to lifespan\" \/>\n<meta property=\"og:description\" content=\"THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan\" \/>\n<meta property=\"og:site_name\" content=\"zimbabwe\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-09T21:14:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-09T23:16:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"735\" \/>\n\t<meta property=\"og:image:height\" content=\"413\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"cfeditoren\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"cfeditoren\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan\"},\"author\":{\"name\":\"cfeditoren\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"headline\":\"Kariba Dam project adds 60 years to lifespan\",\"datePublished\":\"2024-08-09T21:14:06+00:00\",\"dateModified\":\"2024-08-09T23:16:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan\"},\"wordCount\":607,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg\",\"keywords\":[\"Zimbabwe\"],\"articleSection\":[\"all news\",\"Economy\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan\",\"name\":\"Kariba Dam project adds 60 years to lifespan - zimbabwe\",\"isPartOf\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage\"},\"thumbnailUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg\",\"datePublished\":\"2024-08-09T21:14:06+00:00\",\"dateModified\":\"2024-08-09T23:16:42+00:00\",\"author\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\"},\"description\":\"THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to ...\",\"breadcrumb\":{\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage\",\"url\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg\",\"contentUrl\":\"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg\",\"width\":735,\"height\":413,\"caption\":\"Kariba Dam project adds 60 years to lifespan\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.africa-press.net\/zimbabwe\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kariba Dam project adds 60 years to lifespan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#website\",\"url\":\"https:\/\/www.africa-press.net\/zimbabwe\/\",\"name\":\"zimbabwe\",\"description\":\"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb\",\"name\":\"cfeditoren\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kariba Dam project adds 60 years to lifespan - zimbabwe","description":"THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to ...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan","og_locale":"en_US","og_type":"article","og_title":"Kariba Dam project adds 60 years to lifespan","og_description":"THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to ...","og_url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan","og_site_name":"zimbabwe","article_published_time":"2024-08-09T21:14:06+00:00","article_modified_time":"2024-08-09T23:16:42+00:00","og_image":[{"width":735,"height":413,"url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg","type":"image\/jpeg"}],"author":"cfeditoren","twitter_card":"summary_large_image","twitter_misc":{"Written by":"cfeditoren","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#article","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan"},"author":{"name":"cfeditoren","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"headline":"Kariba Dam project adds 60 years to lifespan","datePublished":"2024-08-09T21:14:06+00:00","dateModified":"2024-08-09T23:16:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan"},"wordCount":607,"commentCount":0,"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg","keywords":["Zimbabwe"],"articleSection":["all news","Economy"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan","url":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan","name":"Kariba Dam project adds 60 years to lifespan - zimbabwe","isPartOf":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage"},"image":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage"},"thumbnailUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg","datePublished":"2024-08-09T21:14:06+00:00","dateModified":"2024-08-09T23:16:42+00:00","author":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb"},"description":"THE refilling of the plunge pool at the Kariba Dam Rehabilitation Project (KDRP) has commenced, with the facility 1% to ...","breadcrumb":{"@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#primaryimage","url":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg","contentUrl":"https:\/\/static.africa-press.net\/zimbabwe\/sites\/14\/2024\/08\/sm_1723229184.511589.jpg","width":735,"height":413,"caption":"Kariba Dam project adds 60 years to lifespan"},{"@type":"BreadcrumbList","@id":"https:\/\/www.africa-press.net\/zimbabwe\/all-news\/kariba-dam-project-adds-60-years-to-lifespan#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.africa-press.net\/zimbabwe\/"},{"@type":"ListItem","position":2,"name":"Kariba Dam project adds 60 years to lifespan"}]},{"@type":"WebSite","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#website","url":"https:\/\/www.africa-press.net\/zimbabwe\/","name":"zimbabwe","description":"\u0623\u062e\u0628\u0627\u0631 \u064a\u0648\u0645\u064a\u0629 \u0639\u0644\u0649 \u0645\u062f\u0627\u0631 \u0627\u0644\u0633\u0627\u0639\u0629","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.africa-press.net\/zimbabwe\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.africa-press.net\/zimbabwe\/#\/schema\/person\/068c7ab4e9634ae78ec5d54ec46598bb","name":"cfeditoren"}]}},"_links":{"self":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts\/97438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/comments?post=97438"}],"version-history":[{"count":0,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/posts\/97438\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/media\/97437"}],"wp:attachment":[{"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/media?parent=97438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/categories?post=97438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.africa-press.net\/zimbabwe\/wp-json\/wp\/v2\/tags?post=97438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}