President of the Republic on his way to Huíla

20
President of the Republic on his way to Huíla
President of the Republic on his way to Huíla

Africa-Press – Angola. President João Lourenço is on his way to the province of Huíla, where he will inaugurate the Matala Hydroelectric plant.

The Matala Hydroelectric Plant, in the province of Huíla, increased production capacity from 27.2 to 40.8 megawatts, with the entry into operation of the third turbine, which will guarantee the supply of quality electrical energy to benefit several communities in the provinces of Huíla and Namibe.

To increase the current electrical power of this dam, which will be reopened on Friday, the Government invested one hundred and six million, nine hundred and forty thousand, six hundred and seventy-six euros and twelve cents (106,940,676.12), for the works of rehabilitation of equipment at the Vila da Matala Hydroelectric Power Station, Substation and Electric Grid, which will reduce the cost of operating thermal power plants by reducing fossil fuel consumption.

For More News And Analysis About Angola Follow Africa-Press

LEAVE A REPLY

Please enter your comment!
Please enter your name here